澳大利亚标准组织今天发布了AS/NZS 60335.2.9/A1:2011,其内容可以在SAI global的网站免费下载。看了一下,内容主要是修改了22.113针对多士炉的弹射装置,提出了专门要求。
# j& ~5 q6 {$ N* s' W& @由于欧洲还没有发布针对IEC 60335-2-9:2008的EN版本,所以欧洲什么要求还不知道。
% F) N8 K3 P! y2 K ?7 G; e
- m; q. n* p; i7 P, \内容如下,大家可以探讨一下:
: v1 w% W9 [; P$ P" f' c4 t7 q: s
) G- r0 c$ h7 Z+ E0 ?+ U8 w) t. Z9 T22.113 Replace the text by the following.
0 P: b2 K! v5 Y6 lToasters having an ejector mechanism shall be constructed so that they switch off" @) {2 w3 }; ]5 @
automatically after the normal toasting time even if the ejector mechanism is( r9 d/ i; k2 ~ }1 t3 h$ `
blocked by the bread.
3 P; ^+ l; p& v5 C. g1 U" oFurthermore, toasters having an ejector mechanism shall be constructed so that
8 Z5 d0 q( D8 qthey switch off automatically after the normal toasting time even if the operating+ G4 R3 Q0 C% Q! N; ]- Y
lever is held down. This requirement is not applicable to toasters having an ejector
; V$ R: R$ N/ V @- f: fmechanism if the operating lever is recessed so as to avoid it being inadvertently
3 d! V3 z; E j" B: f2 A2 lheld down by a vertically moving roller door or the like.9 I8 n* z: f2 K) ?6 N, A
Compliance is checked by inspection and by the following tests for ejector
- M" q; h/ K" c6 dmechanisms blocked by the bread and for toasters not having a recessed operating
( ~: Y! B+ ^/ b: W& rlever.' o; b4 u% k6 z; _
The toaster is supplied at rated voltage and the ejector mechanism is prevented6 B* u" I I& }& y: O
from releasing. On the completion of the normal toasting time, heating elements
0 Q# B9 |6 p) o7 k: }) | gshall be automatically disconnected from the supply by at least an all-pole
/ c( P, l8 A( Q8 @2 ~disconnection, micro-disconnection. However, a single pole, micro-disconnection. G* {# {+ m6 U0 }3 J' v( V
is allowed, provided heating elements are not accessible to the test probe 12 of IEC1 i% |& q( Z( G" i% q: b- I& |$ `
61032.
5 m1 T+ b7 ^, y' `1 Z$ }8 `) BFor toasters not having a recessed operating lever, the test is repeated, the, S, B9 v. X. f/ B! ]" {, m
toaster being supplied at rated voltage with the operating lever prevented from
! r+ h! m. ^- Q- M- Nreleasing. On the completion of the normal toasting time, heating elements shall be
4 Y q- R8 m# \automatically disconnected from the supply by at least an all-pole disconnection,+ z( N! x7 `3 c' e1 N
micro-disconnection. However, a single pole, micro-disconnection is allowed,
' ]/ P+ |( u' y6 x: U, Lprovided heating elements are not accessible to the test probe 12 of IEC 61032. |
|