|
请参考IEC 60950-1 clause 1.5.6:! W( X! [ ~; L0 P; k% S: i9 n A
A capacitor connected between two line conductors in a PRIMARY CIRCUIT, or between one line
& S; @- X. r2 ?$ aconductor and the neutral conductor or between the PRIMARY CIRCUIT and protective earth
( s. U% p9 t& {: Y* m& Mshall comply with one of the subclasses of IEC 60384-14 and shall be used in accordance6 g: w4 A& s$ l8 O1 Z
with its rating. This requirement also applies to a capacitor bridging DOUBLE INSULATION or0 u$ n3 z% R A4 Q+ z
REINFORCED INSULATION elsewhere in the equipment. The details of the damp heat, steady* ?6 U8 ]* v) n9 M( w
state test as specified in 4.12 of IEC 60384-14 shall be as follows:
" K; N1 a+ T; ~* n− Temperature: 40 °C ± 2 °C;0 ^$ n- F$ [1 Z4 M0 E
− Humidity: 93 % ± 3 % relative humidity;
& F. T9 h+ Z( R: ]; Y% Z− Test duration: 21 days.
& |1 O" T; ~% jNOTE 1 Capacitors that have been subjected to a test duration longer than 21 days are considered to have met
) I8 V# y Q: Xthe test duration criteria.
$ f/ b) ]; f3 [. G+ j GThe above requirement does not apply to a capacitor connected between a HAZARDOUS1 w# m( U+ t" ~9 C0 Z
VOLTAGE SECONDARY CIRCUIT and protective earth, where only BASIC INSULATION is required., N2 j; O$ Z2 s p% _% W
NOTE 2 The test of 5.2.2 still applies between the HAZARDOUS VOLTAGE SECONDARY CIRCUIT and protective earth.: o w+ c7 C6 s1 w; r: e( |# m
The appropriate capacitor subclass shall be selected from those listed in Table 1C, according
# l9 q( b+ a2 {3 }to the rules of application in the table.
# ]: r" d- k3 k表格不会贴,所以还是自己找60950的标准好好看一下 |
|