|
| DSH 4017 O( e9 u$ C5 k2 Y9 e8 d0 i& k0 E
9 G( R! k9 i. r0 |' d! I' t7 { | Mains supply transformers: Short Circuit and Overload tests
8 s9 j& b- V6 T# l | 57.9.1
* e0 s* k& T) Q) A- D | 60601-1(ed.2);am1;am2
, p- V1 N4 B8 z |
& w, R1 n7 y" `! m! |4 ]Standard(s)- (year and edition):9 @/ D; H j1 Z
IEC 60601-1:1988 Ed.2 Am1+Am2
' B: V8 c7 r. ]( `; kSub clause(s): 57.9.19 O0 j7 W, V" j) L
Sheet n°: DSH-401
3 b8 O; M8 ?2 XSubject: Mains supply transformers: Short Circuit and Overload tests
8 W: V' h5 C7 L3 hKey words: Over-current, protection, overload& D8 G; q5 I- u5 x1 ?
Confirmed by CTL at its 39th meeting, in Cologne! w3 K# x: S$ S8 u/ b* o
Question:" | R( u7 k. g9 A: r; w
Secondary circuit OVER-CURRENT PROTECTION is the first active component on the; i! z$ Q! J; ?& m! @. J! Q
secondary side of a mains supply transformer. Is the overload test performed before or after the+ z. c! m: u9 Z W( H5 K- I, S
fuse?, U/ b+ S: }0 A4 f
Insufficient transformer winding crossover insulation and secondary circuit CREEPAGE, k% E5 ?( s$ |2 r
DISTANCES and AIR CLEARANCES causes transformer winding to short-circuit and exceed
2 r7 w. ^8 M g% S0 n! K5 ?9 Fallowable temperatures.
0 W3 Z/ Y$ M' g7 Y5 C9 @( @Decision:
: v/ H. i1 H' l3 uIf the possibility of a short-circuit exists before the secondary OVER-CURRENT PROTECTION5 V, H$ W/ X# P( D! }
device (e.g. failure of basic insulation between winding or detachment of the wiring) the short: Q+ l( P' Y5 t6 E: p3 N
circuit test should be conducted at the exit of the wiring from the transformer.& j/ `% m L3 D- E# R
(N.B. Similar recommendations can be made for batteries and their protective devices)# g5 u1 T9 Y7 s8 W
The overload test however must always be conducted after any secondary OVER-CURRENT7 n; W1 r2 k; L/ Z1 `
PROTECTION device (conform clause 57.9.1b) providing that the conditions of sub-clause
" K% ?3 d7 A- c! r9 m& L57.9.1. second dash are fulfilled.& b+ X- c& `5 ?6 R/ A0 P; h
* I0 c* j4 I1 R7 t4 p
9 F$ }( Z! d7 i |
本帖子中包含更多资源
您需要 登录 才可以下载或查看,没有帐号?注册安规
x
|