澳大利亚标准组织今天发布了AS/NZS 60335.2.9/A1:2011,其内容可以在SAI global的网站免费下载。看了一下,内容主要是修改了22.113针对多士炉的弹射装置,提出了专门要求。9 u; v( J& n+ m0 g
由于欧洲还没有发布针对IEC 60335-2-9:2008的EN版本,所以欧洲什么要求还不知道。9 b/ q! ~# g& U1 E
- ]* k$ x% g6 d4 m内容如下,大家可以探讨一下:
4 r: H& d2 n: a1 p8 M% }$ a" M4 z: y5 A
22.113 Replace the text by the following.: o4 a U7 q9 g D
Toasters having an ejector mechanism shall be constructed so that they switch off
/ G5 Y$ ]3 Z, B: V t! e! n: Oautomatically after the normal toasting time even if the ejector mechanism is
0 |# n8 d& i, S$ Y2 B# u6 Qblocked by the bread.
0 K+ n. p C- P4 m9 Y1 s* G3 p, ]Furthermore, toasters having an ejector mechanism shall be constructed so that8 f/ ~2 U1 L1 i# ?! Q4 N
they switch off automatically after the normal toasting time even if the operating
" x- U! }. G, Tlever is held down. This requirement is not applicable to toasters having an ejector9 {$ p0 ]; p+ K
mechanism if the operating lever is recessed so as to avoid it being inadvertently
) T: U0 B- N* _0 A0 U% Aheld down by a vertically moving roller door or the like.
" j4 }2 B( _. D' X" QCompliance is checked by inspection and by the following tests for ejector
; I5 c1 B$ U$ }8 Kmechanisms blocked by the bread and for toasters not having a recessed operating, \" y: j, F3 z) u* L/ S
lever.. q, l& v/ T% q9 `1 O
The toaster is supplied at rated voltage and the ejector mechanism is prevented2 ?8 R$ p. m, w. Q% X' T
from releasing. On the completion of the normal toasting time, heating elements
) I3 s0 D( ~* Eshall be automatically disconnected from the supply by at least an all-pole
" |$ M0 w( m) s3 q3 S5 Adisconnection, micro-disconnection. However, a single pole, micro-disconnection" Q0 b# u0 ]' [$ z
is allowed, provided heating elements are not accessible to the test probe 12 of IEC
! Z4 z3 L1 Z0 A' h& o61032.2 g6 A$ B& y+ V6 K: x
For toasters not having a recessed operating lever, the test is repeated, the! d+ D9 H4 g9 L% B8 w
toaster being supplied at rated voltage with the operating lever prevented from. ~+ L6 y5 u/ ] ~
releasing. On the completion of the normal toasting time, heating elements shall be# p: @& p/ [2 Y; ~ N
automatically disconnected from the supply by at least an all-pole disconnection,# V$ `" d; \% n( o5 ~8 T6 q" s* `
micro-disconnection. However, a single pole, micro-disconnection is allowed,
9 \- [2 K" A! s, G) a; @provided heating elements are not accessible to the test probe 12 of IEC 61032. |
|