[POW] DSH 588 Verification of main contact position, position of the handle

[复制链接]
跳转到指定楼层
楼主
发表于 2012-11-7 18:30 | 只看该作者 回帖奖励 |倒序浏览 |阅读模式
广东安规检测
有限公司提供:
DSH 588  g" `  ?: X+ C5 F1 ^  P- d& M

/ G& B1 r8 M7 O3 Z  B7 V
Verification of main contact position, position of the handle0 h3 w2 g) L- z6 [" {* _& y& }
8.2.5.3.2 of IEC60947-1 and 8.3.3.9 of IEC60947-2
, [0 p2 B* d, S/ ~, S
60947-1(ed.1);am1 & 60947-1(ed.2) & 60947-1(ed.2);am1;am2 & 60947-1(ed.3) & 60947-1(ed.3);am1;am2 & 60947-1(ed.3);am2 & 60947-1(ed.4) & 60947-1(ed.5) & 60947-1(ed.5);am1 & 60947-2(ed.1);am1 & 60947-2(ed.2) & 60947-2(ed.2);am1;am2 & 60947-2(ed.3)
) E" ~- }4 k! ]! Y* t6 D6 B. k

- X) i' ^* n3 _0 y+ [% b& K! L1 g/ Y# zStandard(s): IEC60947-1, IEC60947-) W5 J5 C- E# x  ~- l/ e
2, IEC60947-3; V0 b- }% |4 Z% S
Sub clause(s):
6 Z% @' E8 e2 [6 A8.2.5.3.2 of IEC60947-1 and
% I4 H( y0 g- J7 T- F8.3.3.9 of IEC60947-2
' K) E2 s+ F  p# ~1 ESheet No.
" L% W$ `2 _) b; W8 VDSH 588/ J" v: z; y5 ^: C0 q1 S
Subject:
7 v: h3 g- @7 n4 Y) m( [9 h$ I; DVerification of main contact
/ q4 p! e% F0 @3 E0 ~5 u9 ^1 oposition, position of the handle6 z6 x( K3 e% L& c0 P4 d  }
Key words:% M3 m' v+ n& f& ]$ m5 M+ _( ^' \7 Y
- suitable for isolation7 L/ Y! T" E) [- k+ H8 i: c
- indication of contact
; m1 I; _& ^0 Q  t5 Y, B9 u1 tposition5 d5 |+ I) G; J+ b0 Z; x! A
Decision approved; N( L* C8 n  W& p' Z
during the CTL Plenary- B7 K3 i) q9 z8 M
Meeting 2006
- R( t; Q2 C' i& n5 Z3 T7 h5 uQuestion:9 b9 |- J8 M$ C: s" I& e
Verification of the main contact position is conducted only on products suitable for isolation. This is an
" n2 q* j, I) @" J5 ?additional requirement to be verified. With respect to this test, the following two questions gave rise to
1 H3 h- ?0 `3 G6 Sdiscussions
5 }/ n' S* R9 F- R' c  ]+ o% Z( uQ1: When after the 3F test, the indicator comes to rest in a position between the trip and open position (which
0 a8 h, p8 ]% Y# `4 J) k* ]is not the tripped or open position as indicated on the product), is this a pass when tested according 8.2.5.3 of
/ d7 h% f4 P! r9 g; M2 T* M7 t" Z0 AIEC60947-1?
! {& X  m! O& A( z6 Y5 c4 LQ2: If the answer of Q1 is yes, is this in conflict with the general constructional requirements of 7.1.5 or how
; _# ]  _5 O" v. h: Z  w: n, g4 tshould section 7.1.6.1 (additional constructional requirements) be interpreted?+ J" F, P" p' v% l3 L- w
Decision:' P2 N8 k+ X! e8 Y  }' `
There are two possibilities, depending on the features of the MCCB:
! }" `1 k0 [" S' J1) The indicator is the actuator, and it is the only position indicator, or: R" \3 F4 e/ k# N; n
2) There is an actuator that may show the operating position, but in addition there is a
% w; }+ Y. l6 r& f) m% R3 J5 y* m4 kseparate position indicator.
+ _3 h+ G, Q0 Q! B* F; D" J+ yFor construction per item 1, this result is not acceptable% q( E7 l$ J( A6 i$ m* r  Q3 _: X8 Y
For construction per item 2, the result described is acceptable if the separate position
3 h0 k# b9 s0 J( M8 e4 Aindicator unambiguously shows the closed position, irrespective of the position of the
- H$ |, C- y" c: ~* Dactuator.
$ i: F2 K- D/ A3 [Refer to IEC 60947-1, Clause 7.1.6.1
" }. k, w: ]: h3 }
% O# N  c/ v- [, y% ~  L2 J5 F$ O! Z0 E+ k

本帖子中包含更多资源

您需要 登录 才可以下载或查看,没有帐号?注册安规

x
您需要登录后才可以回帖 登录 | 注册安规

本版积分规则

关闭

安规网为您推荐上一条 /2 下一条

QQ|关于安规|小黑屋|安规QQ群|Archiver|手机版|安规网 ( 粤ICP13023453-10 )

GMT+8, 2024-11-30 11:11 , Processed in 0.077412 second(s), 25 queries .

Powered by Discuz! X3.2

© 2001-2013 Comsenz Inc.|广东安规赞助

快速回复 返回顶部 返回列表