直流侧可有可无,通过short test评估就OK; h$ E5 x; A! m7 n5 d7 C, J4 O
交流侧就看你设计了,要样机里没有,需在说明书中说明装机时交流侧用的外置Fuse的Rating,相关要求如下(IEC 62109-1):
) |, D0 N' a; N; \9 U/ Q; F5 P) t9 @! x5 r
4.4.4.5 Output short circuit- U# l/ {2 w4 N
Each power output port of the PCE, and each section of a tapped output, shall be tested one/ y! @6 n3 P# O% h4 Q0 b* G
at a time, to simulate short circuits in the load or wiring. Overcurrent protection devices as
# D7 i6 J! \: P9 y) J/ T' c. e2 B6 qprovided in the PCE or as specified in the installation instructions, shall be fitted during the
( `7 D$ e6 B1 N8 p- @& |test. All other outputs are loaded or not loaded, whichever load condition of normal use is less/ M7 m5 D( { z7 T3 P# z
favorable.; o7 p' B0 A! {0 F" Q
Testing is required to be performed on all combinations of terminals for the port under3 K6 g! |& Z1 N6 N& O
consideration, two at a time, including neutral and earth terminals, and one test with all% ^2 h7 L2 B# Q2 q+ k! y. q; F
current-carrying terminals of the port shorted together at once. Where analysis shows that the& A. l2 N- U( Z8 @% o& F
test for one combination is representative of other combinations, tests may be omitted.& ~+ I" h$ q% M
In addition to the requirements of 4.4.3, the short-circuit currents are to be recorded and if
4 l- V p/ L" x+ |they exceed the maximum rated current of the circuit, the maximum measured current shall be7 m/ k7 N; ^2 ?/ |3 [) b
provided in the installation manual for the purpose of coordination of overcurrent protection of4 A; P! t) A9 P2 C
the external circuit conductors (see 5.3.2)." J4 V3 j- k7 P3 U' p% U5 T3 ^
The value(s) to be recorded and to be provided with the PCE instructions are the peak" u! V! y8 t6 O. w" z6 P
current, and the highest of the RMS current values measured or calculated over a time period
1 s X# U! [+ y9 w. Bas follows:
( _7 o6 |6 J1 l {4 {a) for AC signals, 3 cycles of the nominal AC frequency for the port under consideration, in( g) E% i& Q. W# e
which case the value is to be stated as the 3-cycle RMS value;! h& I, e8 B% y
b) for all signals, the duration of the short circuit from the time the short circuit is applied, until$ C, D7 M- a( t1 }) P) f4 J
the time the short circuit current is interrupted by a protective device or other mechanism, in8 \$ w: D7 o) ~. R
which case the value stated is to include the RMS value and the time period in seconds;& L. a5 U+ F! O0 j/ a# O
c) for short circuit tests that result in a continuous non-zero value, the steady-state RMS
# K q! d/ J, N' H8 Tvalue, in which case the value is to be stated as a continuous RMS value.
7 l4 P1 x }) E- ?* x9 N7 u$ r4 mNOTE Where the intended use of the short-circuit current information requires a different type of measurement,
. i4 o( F0 ]% p! U6 M( j8 {additional data may be provided. For example, for AC mains fault current contribution some utilities may prefer a$ ~+ H `4 `) E( W/ V( q
¼-cycle RMS or other RMS calculation to the 3-cycle RMS above. |
|